2022国产精品不卡a_一级毛片无遮挡免费_国产三级片视频在线有码_苍井そら无码50分钟_国产午夜精品1区2区3福利_免费精品无码AV在线播放_日韩欧美国产视频播放_性老少配tube高清在线_扯掉亵裤屈辱姿势_欧美zoofilia杂交孕妇

Platform environmental control system of booster station

The offshore wind farm is mainly composed of wind generator set and offshore booster station. The five JOSUN brand systems run through all the links of effective power transmission, which fully escort the normal operation of all the wind farm equipment.

  • detailed information
  • Associated products
  • Related cases
  • Contact us
  • Consultation
Product features:

Offshore booster station is the heart of offshore wind power. It is unattended 24 hours a day and should ensure normal operation in the harsh environment of high temperature, high humidity, high salt fog and cold and wet winter at sea. The external environment design conditions are unattended, high temperature, high humidity and high salt fog.

seasontemperature(℃)Relative humidity(%Average salt spray content
summer3280

0.33~23.6

mg/m3

winter-1050

Suitable products for each functional area, to meet the reliability, maintainability, environmental adaptability, support, testability, security.

Basic parameters: Application:
Class1 rubber and plastic insulation pipe

More+
Drying and Deodorizing Device For Shoes and Hats

More+
Automatic control system

More+
Mobile post air supply unit

More+
Platform environmental control system of booster station

More+
Jet flow supply device

More+
  • Sales consulting :

    0523-87592868
  • Complaints Hotline :

    0523-87599555
  • After sale :

    0523-87598760
  • Add attention to
  • Comeing soon
    Please select a search category:  News     Case    Product